Big Ideas,
a Tiny House
And Simple Living

Tiny House Recap

11/21/2016

15 Comments

 
Picture
After living for years in traditionally scaled homes, we sold our last house and moved to an apartment to try  living in a smaller footprint. We didn't miss the space, we loved ditching our mortgage and we found ourselves firmly on the path to living more sustainably.

​We finished this house and moved in about 15 months ago. People late to our story have asked about our build, so I figure it's time for a retrospective.
 

Picture
Site prep. We were fortunate enough to have a friend invite us to build on a corner of her 5-acre property in the Blue Ridge mountains. We cleared and leveled (or partially leveled) a site for our house, with enough room to build a separate screen house which went up first. (More on the screen house here.) We scavenged old boards and used them to build a retaining wall, then reinforced the wall with stones from the woods.

Picture
​The trailer. Zoning doesn't allow a second foundation-built house on the property, so we built on a trailer. Ours is  on a 24-foot equipment trailer from Tiny House Builders of Georgia. Our design runs the full 24' of the trailer and extends over the bed two feet on both sides. We used 10" joists to raise the floor over the wheel wells; it also left us plenty of room for insulation). Bill drilled holes through the trailer to attach the joists and bottom layer of plywood with 6" lag screws.

Picture
​Framing. We went with a "stick built" house on 24" centers (sometimes referred to as advanced framing). The technique saved us a little money (by using less wood) and reduced the house's overall weight. We designed the framing in about 8-foot sections so that it would be easy for the two of us to lift pieces into place and attach them. We put up four 4x4" posts to carry the weight of the roof, since we decided to go with a split roof design that incorporated clerestory windows.

Picture
​Roof. After a couple months of tarping the build site for rain, we were thrilled to roof the house. We installed a beam and framing for the row of clerestory windows between our two rooflines, then hung rafters and screwed down plywood decking. On top of the plywood, we went with a layer of WeatherWatch instead of roof felt for more leak resistance. On top of that went panels of corrugated steel fastened using screws with rubber washers. Bill bent the flashing out of strips of galvanized steel.

Picture
Sheathing and house wrap. Plywood installed on the exterior studs made our build look more like a home. After cutting out the spaces for our windows and doors, we swathed the house with Dupont Tyvek HomeWrap. We'd talked about adding a rain screen which would leave a gap of air between the house wrap and the siding yet to come...but we forgot. Rainscreen helps control moisture. (You can read more about it here, for more information.) So far, so good here without the rainscreen.

Picture
​Windows and doors. We knew we wanted a lot of light and cross ventilation (no air conditioning) in our house. We looked at second-hand windows, but finally decided we didn't want to take the time to scavenge the exact sizes we wanted. The best deal we found was for Jeld Wen windows and doors at a local lumber yard. We made a last-minute decision to swap out one window for a third door when we thought about building a deck. So, 11 windows and three glass doors it was.

Picture
​Siding. We wanted to break up the sides of the house by using wood and metal siding. Our final choices: corrugated steel (same as the roof) and wood clapboard (stained the same color as the screen house). Snow came before we could finish the siding, and eventually our progress crawled to a stop. We took a few months off and finished the last side and the eaves of the house in the spring. We started the eaves with super light-weight panels, but switched to thicker plywood by the end. 

Picture
Wiring. Our electrical plan got a little complicated when we decided to go solar as much as we could afford. We found a solar generator (the SolMan classic by Sol Solutions), and Bill designed the wiring to go to two boxes. All the lights and most outlets are wired to a box powered by our generator. The hot water heater, water pump, microwave and back-up heater—all items that need surges of power—use grid power drawn from our friend's house.

Picture
Plumbing. A mountain spring feeds the cistern that supplies water to our friend's house. We tap into that supply. We went with PEX water pipes because PEX is flexible, inexpensive and easy to work with. Bill watched YouTube videos to figure out the little he didn't already know. As far as waste pipes go, we're careful about everything that goes down our drains so it can be piped to a mulch pit. We're not on septic, so urine also goes to its own pit. We deal with solid waste by composting it.

Picture
Insulation, walls and floor. With the electrical and plumbing installed, we insulated between the ceiling rafters with rigid foam and between the wall joists with EcoTouch Fiberglas. The walls went up fairly quickly with standard drywall; the ceiling is light-weight (too light-weight) beadboard panels. We painted the walls and ceiling white, knowing we would have dark wood floor and trim For the floors we found a good deal on pine boards at Lumber Liquidators, then stained them with the same color as the exterior house. 

Picture
Kitchen, bathroom and bedroom. We built interior walls to divide our space for a bathroom on one end of the house and sleeping space on the other. The interior bathroom wall also houses the water heater, plumbing, electrical, a medicine cabinet and the pantry. Both walls stop short of the ceiling for air flow and light. We went with a big sink, undercounter fridge, alcohol-burning stove, butcher block counters and IKEA cabinets in the kitchen. Besides the DIY composting toilet, the bathroom houses a mini sink and a metal-lined shower.

Picture
Deck. Most of the deck went up after we moved in. It wraps around three sides and makes it much easier to walk around the house, especially important given our sloped mountain site. The deck also gives us plenty of room for grilling and dining, growing herbs and having friends over. We've planted  grapes and hope they'll grow up the lattice that hides the trailer from view. Still to come: planters outside the big glass sliding door.

A year after we started our build, we  moved in. We finished the deck seven months after that. There's much I've skipped (the wood stove install, for example), so let us know if you have questions about the steps I've passed over here. (Or the steps I included!)
15 Comments

Raising the Roof

9/20/2014

0 Comments

 
Picture
With a soggy summer behind us, we are tired, tired, tired of tarping our build site. It was time for a roof. After installing the beam and framing for the row of clerestory windows between our two rooflines, we hung rafters and muscled plywood up for roof decking. A thousand screws later, we were ready for roof felt—or so we thought. 

During one of our morning web research sessions, Bill read the advice of several tiny housers suggesting it was worth springing for something a little more substantial than roof felt. We returned our $19 tar paper rolls and splurged on $60 rolls of WeatherWatch, used primarily for high-leak areas (eaves, rakes, valleys) on big house roofs.

Now the roof just needs its sheets of corrugated metal. But that will be another day....

0 Comments

Beam Me UP

9/10/2014

0 Comments

 
Picture
I'm writing this in Seattle, where we're spending time with Henry and Eloise and their parents. The only building going on here has been with blocks or sand. Eloise, now four years old, wants to spend the night in our house the next time she comes to Virginia. (We'd better get back to work the second our plane touches down.)

More progress on the build before heading out of town: We finished framing the 8-foot wall sections all the way around and put in nailers where we'll build a couple interior walls. Then we sandwiched two 2x8 boards with a 1/2-inch strip of plywood in the middle and installed the beam that will carry the weight of our upper roof and finished up framing 8-foot walls all the way around. And, right before we left, we constructed three framing sections that will sit atop the beam and hold the six clerestory windows. Once we put on the plywood sheathing and house wrap (plus the roof—can't forget that!), we'll install the windows, which are ready and waiting for us to schedule delivery. First step upon our return: remove the blue tarps we strung up in an attempt to protect the build from the elements. (We'll soon see if they achieved that!)

0 Comments

Frame of Mind—and House

8/28/2014

1 Comment

 
Picture
Finally, a progress report worth reporting: we have leveled the trailer on cinderblocks, moved it into its resting spot, completed the waterproof sheathing and floor joists, installed the subfloor and posts for the split roofline and started the framing. It's beginning to look like we might just be building ourselves a house.

The floor insulation portion of this process felt endless at times. Because we wanted to build our floor on top of the wheel wells, we had to use 10-inch floor joists, leaving deep cavities. After a lot of research and thinking, we realized we could attach furring strips 3 1/2 inches from the top of the joists to hold insulation up against the subfloor. We measured and cut layers of rigid foam insulation for each pocket between joists, then used spray foam to fill the gaps.

Believe me, it was a happy day when we moved on to framing, where a few cuts and a little screwing results in something tangible and satisfying: the skeleton of our walls. We also installed four sturdy posts that will carry the weight of our clerestory roofline. Let the framing continue!

1 Comment

Rain Delay—and other excuses

8/18/2014

2 Comments

 
Picture
It's hard to believe that we've been here in Loudoun since May. My fantasy that we'd be putting the finishing touches on our house by the end of the summer is rather laughable at this point. Why so slow? Well...I got sick, I keep changing the design, it keeps raining, we miscalculate materials, the dog ate my homework...

But we are still enjoying the (slooooooow) process of creating our own spot here on the side of the mountain. Progress report: all the floor joists are in, Bill has figured out the post-and-beam structure for our clerestory roofline, I have promised to stop changing the design and have we installed insulation around the wheel wells. Next up: installing the rest of the subfloor insulation and leveling the site and trailer so we can start on the walls!

2 Comments

    Categories

    All
    Bathroom
    Bedroom
    Ceiling
    Ceiling Fan
    Composting Toilet
    Cooking
    Deck
    Design
    Doors
    Electrical
    Energy
    Flooring
    Floor Plan
    Framing
    Gutters
    Heating
    House Wrap
    Insulation
    Kitchen
    Making Furniture
    Materials
    Plumbing
    Rain Barrels
    Roofing
    Screen Porch
    Shower
    Siding
    Solar
    Stairs
    Storage
    Tiny House
    Trailer
    Ventilation
    Walls
    Windows
    Winterizing
    Wiring
    Wood Stove

    RSS Feed

Powered by Create your own unique website with customizable templates.